At Epic Builders, we don’t assume a renovation has to start with a bulldozer. On this 4,500 sq. ft. project in Hamilton, Ontario, our goal was simple: make the home feel new without tearing out the parts that still worked.

With a $150,000 budget and a two-month timeline, we repainted the existing kitchen cabinets, painted the main and second levels, replaced the flooring and baseboards, re-stained the staircase, and installed a new staircase chandelier. Preserving the existing kitchen and staircase structures saved the client over $100,000 compared with a full rebuild, while still delivering a complete remodel.

Project at a Glance

  • Location: Hamilton, Ontario
  • Size: Approximately 4,500 sq. ft.
  • Style: Modern Refresh
  • Timeline: 2 Months
  • Budget: $150,000
  • Scope: Kitchen cabinet painting, interior painting, new flooring, new baseboards, staircase staining, and new chandelier.

Start Your Project

See More Projects

Updating the Kitchen Without Rebuilding It

A complete kitchen replacement was not necessary for this project.

We repainted the existing cabinets rather than removing them. Paired with fresh wall paint, new flooring and new baseboards, the updated cabinetry gave the kitchen a noticeably different appearance while preserving a layout that already worked.

This was one of the key decisions that helped us stay within budget without cutting into the overall result.

Kitchen Renovations

After removing the existing flooring, we found settlement-related unevenness in the floor and subfloor.

A noticeable height difference also existed between the two.

As Kam, project manager at Epic Builders, puts it: “The kitchen had tile, and the rest of the house had laminate. There was a difference in height between the two, so we needed to level it off. That was one of the challenges we faced.”

Installing the new floor without fixing those conditions first could have left bumps, gaps, or movement in the finished flooring.

Kam: “As you’re walking, you can feel a bit of a bump. And you can see parts of the laminate starting to open up.”

Epic Builders applied self-leveling material where needed to create a more even base before installing the new flooring.

This preparation also helped correct the transition between the former kitchen tile area and the surrounding rooms.

Kam explains why that step mattered: “When you’re dealing with a home that’s 20 to 30 years old, there’s settlement. The subfloor settles, the flooring settles, and once we remove the old flooring, we need to add a base of self-leveler. We need to level everything out so the new flooring doesn’t come undone.”

You may never notice this work in the finished photos, but it makes a real difference in how the floor looks and feels.

The staircase became a main feature of the finished project without needing to be rebuilt, delivering the visual change our client wanted without the cost of replacing it.

More Than $100,000 Saved Through Selective Updates

Preserving the kitchen and staircase let the $150,000 budget stretch across cabinet painting, flooring, baseboards, and the staircase, instead of being spent rebuilding just one or two rooms.

The goal was not to replace the most things. It was to spend the budget where it would make the greatest difference.

Client Savings

$100K+

Saved compared with completely rebuilding the existing kitchen and staircase.

Keeping the Project on Track for Two Months

Kam identified the kitchen, flooring, and painting as Monza’s three main coordinated workstreams: closely connected stages where scheduling mattered most.

The EPIC Process

Trade Handoffs

We planned trade handoffs about a day apart. For example, the flooring crew started the day after the kitchen work wrapped up. Kam credits the on-time eight-week completion to having the right crews and materials lined up in advance, rather than leaving extended gaps between stages.

Reducing Downtime

That coordination kept the project on track for the full two months.

The Finished Monza Project

The finished home has a cleaner, more modern look while keeping the parts worth keeping: an updated kitchen, a properly prepared floor, fresh paint and baseboards throughout, and a re-stained staircase with a new chandelier as its centrepiece.

Monza Project FAQs

The project was completed in approximately two months, with the kitchen, flooring and painting stages carefully coordinated to reduce downtime.

The existing cabinets and layout were still usable. Repainting them created the update the client wanted without the cost of rebuilding the entire kitchen.

After the existing flooring was removed, self-leveling material was applied where needed to create a more even base and improve the transition between the former kitchen tile area and surrounding rooms.

The project budget was approximately $150,000.

Your renovation does not have to start with tearing everything out.

We can look at what is worth keeping, what needs attention and where your budget can make the greatest difference.

Book a Free Consultation

Ready to Build Something Epic?

Call us, email us, or book your free consultation.
The first step is booking your Discovery Call. Fill out the form and let’s schedule a time that’s convenient for you. Share your wish list, what you strive to achieve and we’ll guide you through the next steps.

Call Us Now (844) 992-3742

Take the First EPIC Step

Provide your contact information and our team will reach out within 24 hours!

    Attachments (optional)Up to 3 pictures (*.JPG) / 2 MB each